   |                |                     |       |        |40. Purchase of cooking materials by |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Seng Longkmie Pynursla Pyllun        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |41. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Pynursla Mihngi Sport&Cultural Club  |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |42. Improvement of badminton court   |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |by Seng Samla Umkor, Pynursla        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |43. Improvement of Community Hall by |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Pynursla Seng Samla Social Cultural  |              |              |                          |              |           |              |              |
   |                |                     |       |        |and Sports Club                      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |44. Improvement of Raid Nongkhlieng  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |M.E School building                  |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |45. Construction of footpath from    |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Myllat to Lyngngai                   |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |46. Construction of footpath from    |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongkhlieng to Maniuh                |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |47. Completion of football playground|Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |by Nongkhliehbah Sport & Youth Welfare              |              |                          |              |           |              |              |
   |                |                     |       |        |Organisation                         |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |48. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Sports & Cultural Club Myllat        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |49. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongkhlieng Sport & Cultural Club    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |50. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Lyngngai Maw Myllat Sport & Social   |              |              |                          |              |           |              |              |
   |                |                     |       |        |Welfare Organisation                 |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |51. Construction of footpath at      |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Tyngkei village                      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |52. Construction of footpath at      |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongmadan                            |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |53. Improvement of Community Hall    |Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |by Nongmadan Sport & Cultural Club   |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |54. Construction of footpath at      |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Rang Thylliang Nailar                |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |55. Improvement of water supply at   |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Rangthylliang                        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |56. Fencing of Urksew L.P School     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |57. Purchase of cooking materials    |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |by Seng Longkmie Urksew Wahpathaw    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |58. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Seng Samla Urksew Wahpathaw          |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 Contd....18/-
 [ 18 ]
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |                |                     |       |        |59. Completion of Olim Sing Syiem    |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |School building Pynter               |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |60. Extension of St. Edwin L.P School|Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |playground Pynter                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |61. Improvement of playground at     |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Pynter by Local Dorbar Pynter        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |62. Construction of footpath at      |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongshyrngan village                 |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |63. Furniture of L.P School building |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongshyrngan                         |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |64. Construction of footpath at      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongmadan Mawpran                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |65. Purchase of P.A System by Minor  |Rs.   16,000/-|              |                          |Rs.   16,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Sordar Primary School Mawpran        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |66. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Tylliang Social & Sport Organisation |              |              |                          |              |           |              |              |
   |                |                     |       |        |Nongmadan Mawpran                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |67. Completion of Nongkwai Community |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Hall                                 |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |68. Improvement of R.C L.P School    |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongkwai                             |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |69. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongkwai Sport & Cultural Club       |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |70. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Mawkin Sport Club Nongkwai           |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |71. Improvement of playground by     |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |United Sport & Cultural Club Lyting  |              |              |                          |              |           |              |              |
   |                |                     |       |        |Lyngdoh                              |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |72. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Lyting Larbi Sport Social & Cultural |              |              |                          |              |           |              |              |
   |                |                     |       |        |Club                                 |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |73. Construction of footpath at      |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongsder  village                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |74. Improvement of Community Hall by |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |United Club Nongsder                 |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |75. Improvement of playground by     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Siatbakon Sport Club & Social Welfare|              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |76. Purchase of Sport materials by   |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nangiaikyrsoi Social Welfare & Sport |              |              |                          |              |           |              |              |
   |                |                     |       |        |Club Siatbakon                       |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 Contd....19/-
 [ 19 ]
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |                |                     |       |        |77. Furniture for the following      |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |School/Community Hall Mawkhap Pres-  |              |              |                          |              |           |              |              |
   |                |                     |       |        |byterian L.P School                  |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |78. Mawkhap R.C L.P School           |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |79. Siatbakon Community Hall         |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |80. Purchase of Sport materials for  |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Labour Organisation, Wahlyngkhat     |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |81. Purchase of Sport materials for  |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Laitsohphie Block Social Cultural    |              |              |                          |              |           |              |              |
   |                |                     |       |        |& Sport Club                         |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |82. Purchase of Sport materials for  |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Youth Club Pynursla Iew              |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |83. Purchase of Sport materials for  |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nangkiew Shaphrang Sport Club Urksew |              |              |                          |              |           |              |              |
   |                |                     |       |        |Wahpathaw                            |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |84. Purchase of Sport materials for  |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Nongshyrngan Sport Club              |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |85. Purchase of Sport materials for  |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Pynursla Cricket Club                |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |86. Purchase of Sport materials for  |Rs.    5,000/-|              |                          |Rs.    5,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Seng Samla Wahkhen Organisation      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |87. Purchase of 10 Nos. P.A System   |Rs. 1,50,000/-|              |                          |Rs. 1,50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |by Lyngkyrdem Constituency Develop-  |              |              |                          |              |           |              |              |
   |                |                     |       |        |ment Association @Rs.15,000/- each   |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |88. Purchase of Sport materials by   |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Lyngkyrdem Constituency Development  |              |              |                          |              |           |              |              |
   |                |                     |       |        |Association                          |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |89. Purchase of 5 Nos. Typing Machine|Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |by Lyngkyrdem Constituency Development              |              |                          |              |           |              |              |
   |                |                     |       |        |Association @ Rs. 10,000/- each      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
14 |Khadarshnong-   |Shri B.B Lyngdoh     |2001-  |  30    |1. Fencing of playground by          |Rs.   10,000/-|Rs. 6,50,000/-|Dev.35(III)20/2000/55     |Rs.   10,000/-|   100 %   |     Nil      |completed     |
   |Laitkroh        |                     |2002   |        |Nongkynrih football Club Association |              |              |24-5-02                   |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |2. Extension of Raid Nogkynrih High  |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |School building                      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |3. Completion of Community Hall  by  |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Dorbar Shnong Madan football         |              |              |                          |              |           |              |              |
   |                |                     |       |        |Nongkynrih                           |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |4. Construction of footpath from     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Mawspong to Presbyterian  Cemetry    |              |              |                          |              |           |              |              |
   |                |                     |       |        |by Balang Presbyterian  Nongkynrih   |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 Contd....20/-
 [ 20 ]
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |                |                     |       |        |5. Construction of road from Madan   |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Lyngdoh Nongkynrih to Phudsyntiew    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |6. Construction of motorable road    |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |at Wahlyngngai Nongkynrih            |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |7. Construction of footbridge at     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Wahmadan Mawkma Nongthymmai, Raid    |              |              |                          |              |           |              |              |
   |                |                     |       |        |Nongkynrih                           |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |8. Construction of footpath at Madan |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Lyngkhi Laitlyngkot                  |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |9. Improvement of Kyntiew Shaphrang  |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |High School Building  Laitlyngkot    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |10. Improvement of Syllai Sning      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |playground Nongthymmai Laitlyngkot   |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |11. Repairing of U.P School building |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Laitlyngkot                          |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |12. Construction of footpath from    |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |main road to Lumthangding Laitlyngkot|              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |13. Improvement of Community Hall    |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Iewshillong Laitlyngkot              |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |14. Construction of controlled dam   |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |at Wah Umiew by S.P.N.G              |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |15. Construction of footpath at      |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Wahtongumthymmai Iew Shillong        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |16. Maintenance of L.P School        |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |building Nongthymmai Umthli          |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |17. Construction of footpath at      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Umthli                               |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |18. Improvement of M.E School        |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |building Umthli                      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |19. Improvement of Iewmawiong        |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |playground                           |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |20. Construction of footpath at      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Iewmawiong                           |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |21. Construction of footpath from    |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Laitmawroh to Rangkheng by Dorbar    |              |              |                          |              |           |              |              |
   |                |                     |       |        |Shnong Laitmawroh                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |22. Construction of footbridge at    |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Wah Sohshur Laitkynsew village       |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |23. Construction of Water Reservior  |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |at Laitkynsew                        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 Contd....21/-
 [ 21 ]
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |                |                     |       |        |24. Maintenance and construction of  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |protection wall of Lum Jingshai L.P  |              |              |                          |              |           |              |              |
   |                |                     |       |        |School Umtyngngar                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |25. Improvement of Snieh Masi play-  |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |ground by Laitkor Sports Club        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |26. Construction of footpath at      |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Mawmyrsiang village Laitkroh         |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |27. Improvement of Maitphang Seng    |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Kynthei L.P School building by Women |              |              |                          |              |           |              |              |
   |                |                     |       |        |Organisation Nongthymmai, Laitkroh   |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |28. Construction of 'Ingseng' by     |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Sengiatreilang ki Longkmie Mawjrong  |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |29. Construction of Community hall   |Rs.   40,000/-|              |                          |Rs.   20,000/-|    50 %   |     20,000/- |in progress   |work stopped 
   |                |                     |       |        |Laitkroh Areas                       |              |              |                          |              |           |              |              |due to land
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |dispute
   |                |                     |       |        |30. Construction of footpath from    |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |     Nil      |completed     |
   |                |                     |       |        |Sohra Road to Lum Kyntung, Lum       |              |              |                          |              |           |              |              |
   |                |                     |       |        |Kyntung village                      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |Khadarshnong    |Dr. F.A Khonglam     |2001-  |    8   |1) Const. of low cost building and   |Rs. 4,72,000/-|Rs. 6,67,000/-|Memo No.Dev.35(VIII)30/   |Rs. 4,72,000/-|   100 %   |    Nil       |completed     |
   |Laitkroh        |                     |2002   |        |repairing of building to the 236     |              |              |2001-02/140 dt.18-11-02   |              |           |              |              |
   |                |                     |       |        |beneficiaries @ Rs. 2000/- each      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |Grant to NGOs for const/repairing of |              |              |                          |              |           |              |              |
   |                |                     |       |        |their Clubs/Seng/Houses-name of NGOs |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |2) Kongthong Sports Club             |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |3) Kongthong Nongneng Sports Club    |Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |4) Seng Kynthei Umdiengpoh           |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |5) Seng Kynthei Dympep               |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |6) Seng Kynthei Swer                 |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |7) Tirot Singh Memorial School       |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |8) St. Patrick Memorial School       |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
15 |Shella-Bholaganj|Shri(Dr) Donkupar Roy|2001-  |  11    |1. Construction of a hall-cum office |Rs. 2,00,000/-|Rs.21,49,000/-|                          |Rs. 2,00,000/-|   100 %   |    Nil       |completed     |
   |                |                     |2002   |        |at Mawlong village                   |              |dt. 24.05.2002|                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |2. Construction of an approach road  |Rs. 1,50,000/-|              |                          |Rs. 1,50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |at Burong View Point Laittyra        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |3. Purchase of mosquito nets by the  |Rs.   60,000/-|              |                          |Rs.   60,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Shell Riwar  Youth Welfare & Develop-|              |              |                          |              |           |              |              |
   |                |                     |       |        |ment Organisation, Shella            |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |4. Construction of a platform at     |Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Majai Village                        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 Contd....22/-
 [ 22 ]
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |                |                     |       |        |5. Purchase of chairs, utensils, etc.|Rs.   30,000/-|              |                          |Rs.   30,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |for the Seng Bhalang Sawshyndiar     |              |              |                          |              |           |              |              |
   |                |                     |       |        |Jasir                                |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |6. Purchase of Sewing Machines for   |Rs.   35,000/-|              |                          |Rs.   35,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |the Seng Longkmie Mawlong            |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |7. Renovation of Press Guest House,  |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Laitkynsew                           |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |8. Purchase of machineries, etc for  |Rs.   35,000/-|              |                          |Rs.   35,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |for setting up of a furniture work-  |              |              |                          |              |           |              |              |
   |                |                     |       |        |shop for Bah Lait Nongtraw, Ringur   |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |9. Construction of a rural house for |Rs.   80,000/-|              |                          |Rs.   75,000/-|    -      |       5,000  |in progress   |
   |                |                     |       |        |4 Nos. @ Rs. 20,000/- each           |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |10. Purchase of 3 bundles of CGI     |Rs. 3,82,500/-|              |                          |Rs. 3,82,500/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |sheets for 45 beneficiaries @Rs.3500 |              |              |                          |              |           |              |              |
   |                |                     |       |        |each                                 |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |11. Construction of low cost house   |Rs. 8,32,500/-|              |                          |Rs. 8,32,500/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |for 45 Nos. @ Rs. 18,500/- each      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |Shella Bholaganj|Dr. F.A Khonglam     |2001-  |   13   |1) Const. of low cost building and   |Rs.14,48,000/-|Rs.17,33,000/-|Memo No.Dev.35(VIII)30/   |Rs.14,48,000/-|   100 %   |    Nil       |completed     |
   |                |                     |2002   |        |repairing of building to             |              |              |2001-02/141 dt.18-11-02   |              |           |              |              |
   |                |                     |       |        |beneficiaries @ Rs. 2000/- each      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |Grants to NGOs for const/repairing of|              |              |                          |              |           |              |              |
   |                |                     |       |        |their clubs/Seng/Houses- Name of NGOs|              |              |                          |              |           |              |              |
   |                |                     |       |        |2) Dalade Social Organisation, Sohra |Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |3) Sohra Tourism Society, Nongthymmai|Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Sohra                                |              |              |                          |              |           |              |              |
   |                |                     |       |        |4) Seng Kynthei, Pdengshnong         |Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |5) Seng Kynthei, Khliehshnong(Crech) |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |6) Seng Samla Catholic,Mission Sohra |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |7) Seng Samla Mawmluh (R.C)          |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |8) Seng Samla Pomalang               |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |9) Seng Samla Maraikaphon            |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |10) Seng Samla Nongrum               |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |11) Nongthymmai Sports Club, Sohra   |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |12) Pdengshnong Club                 |Rs.   20,000/-|              |                          |Rs.   20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |13) Mawsmai Sports Club              |Rs.   25,000/-|              |                          |Rs.   25,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
16 |Mawsynram       |Shri(Dr) Donkupar Roy|2001-  |   3    |1. Purchase of machineries, etc. for |Rs.   35,000/-|Rs. 2,51,000/-|                          |Rs.   35,000/-|   100 %   |    Nil       |completed     |
   |                |                     |2002   |        |setting up of furniture shop for     |              |dt. 24.05.2002|                          |              |           |              |              |
   |                |                     |       |        |Shri Khraw Jeengap, Tyngnger         |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |2. Construction of low cost house for||Rs. 1,48,000/-              |                          |Rs. 1,48,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |3 nos. @ Rs. 18,500/- each           |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |3. Purchase of 3 bundles of CGI      ||Rs.   68,000/-              |                          |Rs.   68,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |sheets for 3 nos. @ Rs. 8,500/- each |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 Contd....23/-
 [ 23 ]
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
17 |Mawsynram       |Shri D.P Iangjuh     |2001-  |   14   |1. Development of piggery for 80 nos.|Rs. 3,20,000/-|Rs.24,00,000/-|Dev.35(III)20/2000/52     |Rs. 3,20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |2002   |        |@ Rs. 4000/- each                    |              |              |24-5-02                   |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |2. Poultry Development for 20 nos.   |Rs.   80,000/-|              |                          |Rs.   80,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |@ Rs. 4000/- each                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |3. C.I sheets for 2 bundles to each  |Rs.12,00,000/-|              |                          |Rs.12,00,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |beneficiary  @ Rs. 2400/- per bundle |              |              |                          |              |           |              |              |
   |                |                     |       |        |to 250 nos.                          |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |4. Development of goatary for 20 nos.|Rs.   80,000/-|              |                          |Rs.   80,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |@ Rs. 4000/- each                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |5. Distribution of Sewing Machines   |Rs.   85,500/-|              |                          |Rs.   85,500/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |for 19 nos. @ Rs. 4500/- each        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |6. Embroidery Sewing Machine for     |Rs.    7,500/-|              |                          |Rs.    7,500/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Smt. Jesbina K. Bani of Dewsawlia    |              |              |                          |              |           |              |              |
   |                |                     |       |        |@ Rs. 7500/-                         |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |7. Fishery Development for 25 nos.   |Rs. 5,00,000/-|              |                          |Rs. 5,00,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |@ Rs. 2000/- each                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |8. Development of carpentry for 4 nos|Rs.   16,000/-|              |                          |Rs.   16,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |@ Rs. 4000/- each                    |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |9. Development of Shoes Mini Industry|Rs.    8,500/-|              |                          |Rs.    8,500/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |(to be implemented by Shri Ambroyoa  |              |              |                          |              |           |              |              |
   |                |                     |       |        |Dewkhald Mawpen village)             |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |10.Development of Shoes Mini Industry|Rs.    6,500/-|              |                          |Rs.    6,500/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |(to be implemented by Shri Ambroyoa  |              |              |                          |              |           |              |              |
   |                |                     |       |        |Dewkhald Mawpen village)             |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |11.Development of Shoes Mini Industry|Rs.   15,000/-|              |                          |Rs.   15,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |(to be implemented by Shri Harold    |              |              |                          |              |           |              |              |
   |                |                     |       |        |Risaw of Mawpen village)             |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |12. Financial Assistance for buying  |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Modern Musical Instruments for Arts  |              |              |                          |              |           |              |              |
   |                |                     |       |        |etc. for the Go & Tell Organisation  |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |13. Financial Assistance for the     |Rs.   21,000/-|              |                          |Rs.   21,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |family due to heavy damage by cyclone|              |              |                          |              |           |              |              |
   |                |                     |       |        |(Smt. Maygreen Syiemlieh of lawbah   |              |              |                          |              |           |              |              |
   |                |                     |       |        |village)                             |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |14. Development of Bee-Keeping for   |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |2 nos. @ Rs. 5000/- each             |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
 Contd....24/-
 [ 24 ]
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |Mawsynram       |Shri B.B Nongsiej    |2001-  |   7    |1) Const. of Pongkung Higher Secon-  |Rs. 1,00,000/-|Rs. 2,80,000/-|Memo No.Dev.35(III)20/    |Rs. 1,00,000/-|   100 %   |    Nil       |completed     |
   |                |                     |2002   |        |dary School (10+2)                   |              |              |2000/101    dt. 7-8-2002  |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |2) Const. of St.Ferando Secondary    |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |School Sawsymper                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |3) Const. of Church of God Secondary |Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |School Pongkung                      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |4) Const. of Youngster Primary School|Rs.   50,000/-|              |                          |Rs.   50,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |building Kmawan                      |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |5) Const. of waiting shed at Lad     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Mawlyn                               |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |6) Const. of waiting shed at Lad     |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |Kmawan rum                           |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |7) Const. of waiting shed at Dommaw- |Rs.   10,000/-|              |                          |Rs.   10,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |saw, Mawryngkang                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |                |                     |       |   70   |Purchase of CGI sheets for 70(seventy|              |Rs. 4,20,000/-|Memo No.Dev.35(VIII)30/   |Rs. 4,20,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |beneficiaries                        |              |              |2000-02/117 dt.7-10-2002  |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   |                |                     |       |    3   |1) Purchase of sewing machines of the|Rs. 1,92,000/-|Rs. 2,49,000/-|Memo No.Dev.35(VIII)30/   |Rs. 1,92,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |cost of Rs. 3000/- one machine to be |              |              |2001-02/148 dt. 5-12-2002 |              |           |              |              |
   |                |                     |       |        |distributed to 64 Nos. beneficiaries |              |              |                          |              |           |              |              |
   |                |                     |       |        |(3000 x 64 = 1,92,000/-)             |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |2) Purchase of selling items for     |Rs.   40,000/-|              |                          |Rs.   40,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |40 Nos. of pan shops at the cost of  |              |              |                          |              |           |              |              |
   |                |                     |       |        |Rs. 1000/- per shop (1000 x 40 =     |              |              |                          |              |           |              |              |
   |                |                     |       |        |Rs. 40,000/-)                        |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |3) Purchase of exercise books at the |Rs.   17,000/-|              |                          |Rs.   17,000/-|   100 %   |    Nil       |completed     |
   |                |                     |       |        |cost of Rs. 1000/- per family for    |              |              |                          |              |           |              |              |
   |                |                     |       |        |17 Nos. of families(17x100=Rs.17,000)|              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
   |                |                     |       |        |                                     |              |              |                          |              |           |              |              |
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------