---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | | | |40. Purchase of cooking materials by |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Seng Longkmie Pynursla Pyllun | | | | | | | | | | | | | | | | | | | | | | | | | |41. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Pynursla Mihngi Sport&Cultural Club | | | | | | | | | | | | | | | | | | | | | | | | | |42. Improvement of badminton court |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |by Seng Samla Umkor, Pynursla | | | | | | | | | | | | | | | | | | | | | | | | | |43. Improvement of Community Hall by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Pynursla Seng Samla Social Cultural | | | | | | | | | | | | |and Sports Club | | | | | | | | | | | | | | | | | | | | | | | | | |44. Improvement of Raid Nongkhlieng |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |M.E School building | | | | | | | | | | | | | | | | | | | | | | | | | |45. Construction of footpath from |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Myllat to Lyngngai | | | | | | | | | | | | | | | | | | | | | | | | | |46. Construction of footpath from |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Nongkhlieng to Maniuh | | | | | | | | | | | | | | | | | | | | | | | | | |47. Completion of football playground|Rs. 30,000/-| | |Rs. 30,000/-| 100 % | Nil |completed | | | | | |by Nongkhliehbah Sport & Youth Welfare | | | | | | | | | | | |Organisation | | | | | | | | | | | | | | | | | | | | | | | | | |48. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Sports & Cultural Club Myllat | | | | | | | | | | | | | | | | | | | | | | | | | |49. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Nongkhlieng Sport & Cultural Club | | | | | | | | | | | | | | | | | | | | | | | | | |50. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Lyngngai Maw Myllat Sport & Social | | | | | | | | | | | | |Welfare Organisation | | | | | | | | | | | | | | | | | | | | | | | | | |51. Construction of footpath at |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Tyngkei village | | | | | | | | | | | | | | | | | | | | | | | | | |52. Construction of footpath at |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Nongmadan | | | | | | | | | | | | | | | | | | | | | | | | | |53. Improvement of Community Hall |Rs. 15,000/-| | |Rs. 15,000/-| 100 % | Nil |completed | | | | | |by Nongmadan Sport & Cultural Club | | | | | | | | | | | | | | | | | | | | | | | | | |54. Construction of footpath at |Rs. 40,000/-| | |Rs. 40,000/-| 100 % | Nil |completed | | | | | |Rang Thylliang Nailar | | | | | | | | | | | | | | | | | | | | | | | | | |55. Improvement of water supply at |Rs. 40,000/-| | |Rs. 40,000/-| 100 % | Nil |completed | | | | | |Rangthylliang | | | | | | | | | | | | | | | | | | | | | | | | | |56. Fencing of Urksew L.P School |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | | | | | |57. Purchase of cooking materials |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |by Seng Longkmie Urksew Wahpathaw | | | | | | | | | | | | | | | | | | | | | | | | | |58. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Seng Samla Urksew Wahpathaw | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Contd....18/- [ 18 ] ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | | | |59. Completion of Olim Sing Syiem |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |School building Pynter | | | | | | | | | | | | | | | | | | | | | | | | | |60. Extension of St. Edwin L.P School|Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |playground Pynter | | | | | | | | | | | | | | | | | | | | | | | | | |61. Improvement of playground at |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Pynter by Local Dorbar Pynter | | | | | | | | | | | | | | | | | | | | | | | | | |62. Construction of footpath at |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Nongshyrngan village | | | | | | | | | | | | | | | | | | | | | | | | | |63. Furniture of L.P School building |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Nongshyrngan | | | | | | | | | | | | | | | | | | | | | | | | | |64. Construction of footpath at |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Nongmadan Mawpran | | | | | | | | | | | | | | | | | | | | | | | | | |65. Purchase of P.A System by Minor |Rs. 16,000/-| | |Rs. 16,000/-| 100 % | Nil |completed | | | | | |Sordar Primary School Mawpran | | | | | | | | | | | | | | | | | | | | | | | | | |66. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Tylliang Social & Sport Organisation | | | | | | | | | | | | |Nongmadan Mawpran | | | | | | | | | | | | | | | | | | | | | | | | | |67. Completion of Nongkwai Community |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Hall | | | | | | | | | | | | | | | | | | | | | | | | | |68. Improvement of R.C L.P School |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Nongkwai | | | | | | | | | | | | | | | | | | | | | | | | | |69. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Nongkwai Sport & Cultural Club | | | | | | | | | | | | | | | | | | | | | | | | | |70. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Mawkin Sport Club Nongkwai | | | | | | | | | | | | | | | | | | | | | | | | | |71. Improvement of playground by |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |United Sport & Cultural Club Lyting | | | | | | | | | | | | |Lyngdoh | | | | | | | | | | | | | | | | | | | | | | | | | |72. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Lyting Larbi Sport Social & Cultural | | | | | | | | | | | | |Club | | | | | | | | | | | | | | | | | | | | | | | | | |73. Construction of footpath at |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Nongsder village | | | | | | | | | | | | | | | | | | | | | | | | | |74. Improvement of Community Hall by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |United Club Nongsder | | | | | | | | | | | | | | | | | | | | | | | | | |75. Improvement of playground by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Siatbakon Sport Club & Social Welfare| | | | | | | | | | | | | | | | | | | | | | | | | |76. Purchase of Sport materials by |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Nangiaikyrsoi Social Welfare & Sport | | | | | | | | | | | | |Club Siatbakon | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Contd....19/- [ 19 ] ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | | | |77. Furniture for the following |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | |School/Community Hall Mawkhap Pres- | | | | | | | | | | | | |byterian L.P School | | | | | | | | | | | | | | | | | | | | | | | | | |78. Mawkhap R.C L.P School |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | | | | | |79. Siatbakon Community Hall |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | | | | | |80. Purchase of Sport materials for |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | |Labour Organisation, Wahlyngkhat | | | | | | | | | | | | | | | | | | | | | | | | | |81. Purchase of Sport materials for |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | |Laitsohphie Block Social Cultural | | | | | | | | | | | | |& Sport Club | | | | | | | | | | | | | | | | | | | | | | | | | |82. Purchase of Sport materials for |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | |Youth Club Pynursla Iew | | | | | | | | | | | | | | | | | | | | | | | | | |83. Purchase of Sport materials for |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | |Nangkiew Shaphrang Sport Club Urksew | | | | | | | | | | | | |Wahpathaw | | | | | | | | | | | | | | | | | | | | | | | | | |84. Purchase of Sport materials for |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | |Nongshyrngan Sport Club | | | | | | | | | | | | | | | | | | | | | | | | | |85. Purchase of Sport materials for |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | |Pynursla Cricket Club | | | | | | | | | | | | | | | | | | | | | | | | | |86. Purchase of Sport materials for |Rs. 5,000/-| | |Rs. 5,000/-| 100 % | Nil |completed | | | | | |Seng Samla Wahkhen Organisation | | | | | | | | | | | | | | | | | | | | | | | | | |87. Purchase of 10 Nos. P.A System |Rs. 1,50,000/-| | |Rs. 1,50,000/-| 100 % | Nil |completed | | | | | |by Lyngkyrdem Constituency Develop- | | | | | | | | | | | | |ment Association @Rs.15,000/- each | | | | | | | | | | | | | | | | | | | | | | | | | |88. Purchase of Sport materials by |Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | |Lyngkyrdem Constituency Development | | | | | | | | | | | | |Association | | | | | | | | | | | | | | | | | | | | | | | | | |89. Purchase of 5 Nos. Typing Machine|Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | |by Lyngkyrdem Constituency Development | | | | | | | | | | | |Association @ Rs. 10,000/- each | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 14 |Khadarshnong- |Shri B.B Lyngdoh |2001- | 30 |1. Fencing of playground by |Rs. 10,000/-|Rs. 6,50,000/-|Dev.35(III)20/2000/55 |Rs. 10,000/-| 100 % | Nil |completed | |Laitkroh | |2002 | |Nongkynrih football Club Association | | |24-5-02 | | | | | | | | | | | | | | | | | | | | | | |2. Extension of Raid Nogkynrih High |Rs. 40,000/-| | |Rs. 40,000/-| 100 % | Nil |completed | | | | | |School building | | | | | | | | | | | | | | | | | | | | | | | | | |3. Completion of Community Hall by |Rs. 30,000/-| | |Rs. 30,000/-| 100 % | Nil |completed | | | | | |Dorbar Shnong Madan football | | | | | | | | | | | | |Nongkynrih | | | | | | | | | | | | | | | | | | | | | | | | | |4. Construction of footpath from |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Mawspong to Presbyterian Cemetry | | | | | | | | | | | | |by Balang Presbyterian Nongkynrih | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Contd....20/- [ 20 ] ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | | | |5. Construction of road from Madan |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Lyngdoh Nongkynrih to Phudsyntiew | | | | | | | | | | | | | | | | | | | | | | | | | |6. Construction of motorable road |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |at Wahlyngngai Nongkynrih | | | | | | | | | | | | | | | | | | | | | | | | | |7. Construction of footbridge at |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Wahmadan Mawkma Nongthymmai, Raid | | | | | | | | | | | | |Nongkynrih | | | | | | | | | | | | | | | | | | | | | | | | | |8. Construction of footpath at Madan |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Lyngkhi Laitlyngkot | | | | | | | | | | | | | | | | | | | | | | | | | |9. Improvement of Kyntiew Shaphrang |Rs. 40,000/-| | |Rs. 40,000/-| 100 % | Nil |completed | | | | | |High School Building Laitlyngkot | | | | | | | | | | | | | | | | | | | | | | | | | |10. Improvement of Syllai Sning |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |playground Nongthymmai Laitlyngkot | | | | | | | | | | | | | | | | | | | | | | | | | |11. Repairing of U.P School building |Rs. 30,000/-| | |Rs. 30,000/-| 100 % | Nil |completed | | | | | |Laitlyngkot | | | | | | | | | | | | | | | | | | | | | | | | | |12. Construction of footpath from |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |main road to Lumthangding Laitlyngkot| | | | | | | | | | | | | | | | | | | | | | | | | |13. Improvement of Community Hall |Rs. 40,000/-| | |Rs. 40,000/-| 100 % | Nil |completed | | | | | |Iewshillong Laitlyngkot | | | | | | | | | | | | | | | | | | | | | | | | | |14. Construction of controlled dam |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |at Wah Umiew by S.P.N.G | | | | | | | | | | | | | | | | | | | | | | | | | |15. Construction of footpath at |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Wahtongumthymmai Iew Shillong | | | | | | | | | | | | | | | | | | | | | | | | | |16. Maintenance of L.P School |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |building Nongthymmai Umthli | | | | | | | | | | | | | | | | | | | | | | | | | |17. Construction of footpath at |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Umthli | | | | | | | | | | | | | | | | | | | | | | | | | |18. Improvement of M.E School |Rs. 30,000/-| | |Rs. 30,000/-| 100 % | Nil |completed | | | | | |building Umthli | | | | | | | | | | | | | | | | | | | | | | | | | |19. Improvement of Iewmawiong |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |playground | | | | | | | | | | | | | | | | | | | | | | | | | |20. Construction of footpath at |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Iewmawiong | | | | | | | | | | | | | | | | | | | | | | | | | |21. Construction of footpath from |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Laitmawroh to Rangkheng by Dorbar | | | | | | | | | | | | |Shnong Laitmawroh | | | | | | | | | | | | | | | | | | | | | | | | | |22. Construction of footbridge at |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Wah Sohshur Laitkynsew village | | | | | | | | | | | | | | | | | | | | | | | | | |23. Construction of Water Reservior |Rs. 30,000/-| | |Rs. 30,000/-| 100 % | Nil |completed | | | | | |at Laitkynsew | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Contd....21/- [ 21 ] ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | | | |24. Maintenance and construction of |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |protection wall of Lum Jingshai L.P | | | | | | | | | | | | |School Umtyngngar | | | | | | | | | | | | | | | | | | | | | | | | | |25. Improvement of Snieh Masi play- |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |ground by Laitkor Sports Club | | | | | | | | | | | | | | | | | | | | | | | | | |26. Construction of footpath at |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Mawmyrsiang village Laitkroh | | | | | | | | | | | | | | | | | | | | | | | | | |27. Improvement of Maitphang Seng |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Kynthei L.P School building by Women | | | | | | | | | | | | |Organisation Nongthymmai, Laitkroh | | | | | | | | | | | | | | | | | | | | | | | | | |28. Construction of 'Ingseng' by |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |Sengiatreilang ki Longkmie Mawjrong | | | | | | | | | | | | | | | | | | | | | | | | | |29. Construction of Community hall |Rs. 40,000/-| | |Rs. 20,000/-| 50 % | 20,000/- |in progress |work stopped | | | | |Laitkroh Areas | | | | | | | |due to land | | | | | | | | | | | | |dispute | | | | |30. Construction of footpath from |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Sohra Road to Lum Kyntung, Lum | | | | | | | | | | | | |Kyntung village | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |Khadarshnong |Dr. F.A Khonglam |2001- | 8 |1) Const. of low cost building and |Rs. 4,72,000/-|Rs. 6,67,000/-|Memo No.Dev.35(VIII)30/ |Rs. 4,72,000/-| 100 % | Nil |completed | |Laitkroh | |2002 | |repairing of building to the 236 | | |2001-02/140 dt.18-11-02 | | | | | | | | | |beneficiaries @ Rs. 2000/- each | | | | | | | | | | | | | | | | | | | | | | | | | |Grant to NGOs for const/repairing of | | | | | | | | | | | | |their Clubs/Seng/Houses-name of NGOs | | | | | | | | | | | | | | | | | | | | | | | | | |2) Kongthong Sports Club |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | | | | | |3) Kongthong Nongneng Sports Club |Rs. 15,000/-| | |Rs. 15,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | | | | | |4) Seng Kynthei Umdiengpoh |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | | | | | |5) Seng Kynthei Dympep |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | | | | | |6) Seng Kynthei Swer |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | | | | | |7) Tirot Singh Memorial School |Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | | | | | |8) St. Patrick Memorial School |Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 15 |Shella-Bholaganj|Shri(Dr) Donkupar Roy|2001- | 11 |1. Construction of a hall-cum office |Rs. 2,00,000/-|Rs.21,49,000/-| |Rs. 2,00,000/-| 100 % | Nil |completed | | | |2002 | |at Mawlong village | |dt. 24.05.2002| | | | | | | | | | | | | | | | | | | | | | | |2. Construction of an approach road |Rs. 1,50,000/-| | |Rs. 1,50,000/-| 100 % | Nil |completed | | | | | |at Burong View Point Laittyra | | | | | | | | | | | | | | | | | | | | | | | | | |3. Purchase of mosquito nets by the |Rs. 60,000/-| | |Rs. 60,000/-| 100 % | Nil |completed | | | | | |Shell Riwar Youth Welfare & Develop-| | | | | | | | | | | | |ment Organisation, Shella | | | | | | | | | | | | | | | | | | | | | | | | | |4. Construction of a platform at |Rs. 30,000/-| | |Rs. 30,000/-| 100 % | Nil |completed | | | | | |Majai Village | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Contd....22/- [ 22 ] ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | | | |5. Purchase of chairs, utensils, etc.|Rs. 30,000/-| | |Rs. 30,000/-| 100 % | Nil |completed | | | | | |for the Seng Bhalang Sawshyndiar | | | | | | | | | | | | |Jasir | | | | | | | | | | | | | | | | | | | | | | | | | |6. Purchase of Sewing Machines for |Rs. 35,000/-| | |Rs. 35,000/-| 100 % | Nil |completed | | | | | |the Seng Longkmie Mawlong | | | | | | | | | | | | | | | | | | | | | | | | | |7. Renovation of Press Guest House, |Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | |Laitkynsew | | | | | | | | | | | | | | | | | | | | | | | | | |8. Purchase of machineries, etc for |Rs. 35,000/-| | |Rs. 35,000/-| 100 % | Nil |completed | | | | | |for setting up of a furniture work- | | | | | | | | | | | | |shop for Bah Lait Nongtraw, Ringur | | | | | | | | | | | | | | | | | | | | | | | | | |9. Construction of a rural house for |Rs. 80,000/-| | |Rs. 75,000/-| - | 5,000 |in progress | | | | | |4 Nos. @ Rs. 20,000/- each | | | | | | | | | | | | | | | | | | | | | | | | | |10. Purchase of 3 bundles of CGI |Rs. 3,82,500/-| | |Rs. 3,82,500/-| 100 % | Nil |completed | | | | | |sheets for 45 beneficiaries @Rs.3500 | | | | | | | | | | | | |each | | | | | | | | | | | | | | | | | | | | | | | | | |11. Construction of low cost house |Rs. 8,32,500/-| | |Rs. 8,32,500/-| 100 % | Nil |completed | | | | | |for 45 Nos. @ Rs. 18,500/- each | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |Shella Bholaganj|Dr. F.A Khonglam |2001- | 13 |1) Const. of low cost building and |Rs.14,48,000/-|Rs.17,33,000/-|Memo No.Dev.35(VIII)30/ |Rs.14,48,000/-| 100 % | Nil |completed | | | |2002 | |repairing of building to | | |2001-02/141 dt.18-11-02 | | | | | | | | | |beneficiaries @ Rs. 2000/- each | | | | | | | | | | | | | | | | | | | | | | | | | |Grants to NGOs for const/repairing of| | | | | | | | | | | | |their clubs/Seng/Houses- Name of NGOs| | | | | | | | | | | | |2) Dalade Social Organisation, Sohra |Rs. 15,000/-| | |Rs. 15,000/-| 100 % | Nil |completed | | | | | |3) Sohra Tourism Society, Nongthymmai|Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Sohra | | | | | | | | | | | | |4) Seng Kynthei, Pdengshnong |Rs. 15,000/-| | |Rs. 15,000/-| 100 % | Nil |completed | | | | | |5) Seng Kynthei, Khliehshnong(Crech) |Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | |6) Seng Samla Catholic,Mission Sohra |Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | |7) Seng Samla Mawmluh (R.C) |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |8) Seng Samla Pomalang |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |9) Seng Samla Maraikaphon |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |10) Seng Samla Nongrum |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |11) Nongthymmai Sports Club, Sohra |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |12) Pdengshnong Club |Rs. 20,000/-| | |Rs. 20,000/-| 100 % | Nil |completed | | | | | |13) Mawsmai Sports Club |Rs. 25,000/-| | |Rs. 25,000/-| 100 % | Nil |completed | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 16 |Mawsynram |Shri(Dr) Donkupar Roy|2001- | 3 |1. Purchase of machineries, etc. for |Rs. 35,000/-|Rs. 2,51,000/-| |Rs. 35,000/-| 100 % | Nil |completed | | | |2002 | |setting up of furniture shop for | |dt. 24.05.2002| | | | | | | | | | |Shri Khraw Jeengap, Tyngnger | | | | | | | | | | | | | | | | | | | | | | | | | |2. Construction of low cost house for||Rs. 1,48,000/- | |Rs. 1,48,000/-| 100 % | Nil |completed | | | | | |3 nos. @ Rs. 18,500/- each | | | | | | | | | | | | | | | | | | | | | | | | | |3. Purchase of 3 bundles of CGI ||Rs. 68,000/- | |Rs. 68,000/-| 100 % | Nil |completed | | | | | |sheets for 3 nos. @ Rs. 8,500/- each | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Contd....23/- [ 23 ] ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 17 |Mawsynram |Shri D.P Iangjuh |2001- | 14 |1. Development of piggery for 80 nos.|Rs. 3,20,000/-|Rs.24,00,000/-|Dev.35(III)20/2000/52 |Rs. 3,20,000/-| 100 % | Nil |completed | | | |2002 | |@ Rs. 4000/- each | | |24-5-02 | | | | | | | | | | | | | | | | | | | | | | |2. Poultry Development for 20 nos. |Rs. 80,000/-| | |Rs. 80,000/-| 100 % | Nil |completed | | | | | |@ Rs. 4000/- each | | | | | | | | | | | | | | | | | | | | | | | | | |3. C.I sheets for 2 bundles to each |Rs.12,00,000/-| | |Rs.12,00,000/-| 100 % | Nil |completed | | | | | |beneficiary @ Rs. 2400/- per bundle | | | | | | | | | | | | |to 250 nos. | | | | | | | | | | | | | | | | | | | | | | | | | |4. Development of goatary for 20 nos.|Rs. 80,000/-| | |Rs. 80,000/-| 100 % | Nil |completed | | | | | |@ Rs. 4000/- each | | | | | | | | | | | | | | | | | | | | | | | | | |5. Distribution of Sewing Machines |Rs. 85,500/-| | |Rs. 85,500/-| 100 % | Nil |completed | | | | | |for 19 nos. @ Rs. 4500/- each | | | | | | | | | | | | | | | | | | | | | | | | | |6. Embroidery Sewing Machine for |Rs. 7,500/-| | |Rs. 7,500/-| 100 % | Nil |completed | | | | | |Smt. Jesbina K. Bani of Dewsawlia | | | | | | | | | | | | |@ Rs. 7500/- | | | | | | | | | | | | | | | | | | | | | | | | | |7. Fishery Development for 25 nos. |Rs. 5,00,000/-| | |Rs. 5,00,000/-| 100 % | Nil |completed | | | | | |@ Rs. 2000/- each | | | | | | | | | | | | | | | | | | | | | | | | | |8. Development of carpentry for 4 nos|Rs. 16,000/-| | |Rs. 16,000/-| 100 % | Nil |completed | | | | | |@ Rs. 4000/- each | | | | | | | | | | | | | | | | | | | | | | | | | |9. Development of Shoes Mini Industry|Rs. 8,500/-| | |Rs. 8,500/-| 100 % | Nil |completed | | | | | |(to be implemented by Shri Ambroyoa | | | | | | | | | | | | |Dewkhald Mawpen village) | | | | | | | | | | | | | | | | | | | | | | | | | |10.Development of Shoes Mini Industry|Rs. 6,500/-| | |Rs. 6,500/-| 100 % | Nil |completed | | | | | |(to be implemented by Shri Ambroyoa | | | | | | | | | | | | |Dewkhald Mawpen village) | | | | | | | | | | | | | | | | | | | | | | | | | |11.Development of Shoes Mini Industry|Rs. 15,000/-| | |Rs. 15,000/-| 100 % | Nil |completed | | | | | |(to be implemented by Shri Harold | | | | | | | | | | | | |Risaw of Mawpen village) | | | | | | | | | | | | | | | | | | | | | | | | | |12. Financial Assistance for buying |Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | |Modern Musical Instruments for Arts | | | | | | | | | | | | |etc. for the Go & Tell Organisation | | | | | | | | | | | | | | | | | | | | | | | | | |13. Financial Assistance for the |Rs. 21,000/-| | |Rs. 21,000/-| 100 % | Nil |completed | | | | | |family due to heavy damage by cyclone| | | | | | | | | | | | |(Smt. Maygreen Syiemlieh of lawbah | | | | | | | | | | | | |village) | | | | | | | | | | | | | | | | | | | | | | | | | |14. Development of Bee-Keeping for |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |2 nos. @ Rs. 5000/- each | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Contd....24/- [ 24 ] ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |Mawsynram |Shri B.B Nongsiej |2001- | 7 |1) Const. of Pongkung Higher Secon- |Rs. 1,00,000/-|Rs. 2,80,000/-|Memo No.Dev.35(III)20/ |Rs. 1,00,000/-| 100 % | Nil |completed | | | |2002 | |dary School (10+2) | | |2000/101 dt. 7-8-2002 | | | | | | | | | | | | | | | | | | | | | | |2) Const. of St.Ferando Secondary |Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | |School Sawsymper | | | | | | | | | | | | | | | | | | | | | | | | | |3) Const. of Church of God Secondary |Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | |School Pongkung | | | | | | | | | | | | | | | | | | | | | | | | | |4) Const. of Youngster Primary School|Rs. 50,000/-| | |Rs. 50,000/-| 100 % | Nil |completed | | | | | |building Kmawan | | | | | | | | | | | | | | | | | | | | | | | | | |5) Const. of waiting shed at Lad |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Mawlyn | | | | | | | | | | | | | | | | | | | | | | | | | |6) Const. of waiting shed at Lad |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |Kmawan rum | | | | | | | | | | | | | | | | | | | | | | | | | |7) Const. of waiting shed at Dommaw- |Rs. 10,000/-| | |Rs. 10,000/-| 100 % | Nil |completed | | | | | |saw, Mawryngkang | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | | | 70 |Purchase of CGI sheets for 70(seventy| |Rs. 4,20,000/-|Memo No.Dev.35(VIII)30/ |Rs. 4,20,000/-| 100 % | Nil |completed | | | | | |beneficiaries | | |2000-02/117 dt.7-10-2002 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | | | 3 |1) Purchase of sewing machines of the|Rs. 1,92,000/-|Rs. 2,49,000/-|Memo No.Dev.35(VIII)30/ |Rs. 1,92,000/-| 100 % | Nil |completed | | | | | |cost of Rs. 3000/- one machine to be | | |2001-02/148 dt. 5-12-2002 | | | | | | | | | |distributed to 64 Nos. beneficiaries | | | | | | | | | | | | |(3000 x 64 = 1,92,000/-) | | | | | | | | | | | | | | | | | | | | | | | | | |2) Purchase of selling items for |Rs. 40,000/-| | |Rs. 40,000/-| 100 % | Nil |completed | | | | | |40 Nos. of pan shops at the cost of | | | | | | | | | | | | |Rs. 1000/- per shop (1000 x 40 = | | | | | | | | | | | | |Rs. 40,000/-) | | | | | | | | | | | | | | | | | | | | | | | | | |3) Purchase of exercise books at the |Rs. 17,000/-| | |Rs. 17,000/-| 100 % | Nil |completed | | | | | |cost of Rs. 1000/- per family for | | | | | | | | | | | | |17 Nos. of families(17x100=Rs.17,000)| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Previous Page