VARIOUS BORDER AREAS DEVELOPMENT SCHEMES UNDER SPECIAL CENTRAL ASSISTANCE FOR 1999-2000 |
|||||||||
|
SL.NO |
DISTRICT |
NAME OF PROJECT |
BENEFICIARIES |
B.A.D.O |
AMOUNT SANCTIONED |
Date of Release |
Release of 1st |
Release of 2nd |
Status |
|
|
of fund to D.C |
Installment |
Installment |
Date of completion or O/O |
|||||
|
of work completed |
|||||||||
|
1 |
East Khasi Hills |
Construction of School |
1. Kiengshympet |
Sohra |
Rs. 1,00,000/- |
22.8.2000 |
Rs.50,000/- |
Rs.50,000/- |
Completed 0n 19/5/2001 |
|
Building at :- |
L.P School Nongsteng |
||||||||
|
|
|||||||||
|
|
Extension work of :- |
1.Mawphir L.P school |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs.25,000/- |
Completed on 28/4/2001 |
|
|
Mawphu |
|||||||||
|
2.Laitkynsew Press |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs.25,000/- |
Completed on 1/6/2001 |
|||
|
L.P School |
|||||||||
|
3.Unitarian L.P |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs.25,000/- |
Completed on 12/9/2001 |
|||
|
School Nongwar |
|||||||||
|
4. Laitiam Press L.P |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs.25,000/- |
Completed on 2/6/2001 |
|||
|
School |
|||||||||
|
2 |
East Khasi Hills |
Construction of Betelnut |
1. Seng Khasi |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs.25,000/- |
Completed on 28/2/2001 |
|
Soaking pond of :- |
Laittyrah |
||||||||
|
2. Smt. Meriancy |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs.25,000/- |
Completed on 28/2/2001 |
|||
|
Chyne Mawlong |
|||||||||
|
3 |
East Khasi Hills |
Construction of Bee- |
|||||||
|
Keeping of :- |
1. Shri Mixborn |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 25/4/2001 |
||
|
Shullai Laittyrah |
|||||||||
|
|
2. Shri Donald Pde |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 25/4/2001 |
||
|
Laittyrah |
|||||||||
|
3. Shri Wilfred |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 25/4/2001 |
|||
|
Wahlang Laittyrah |
|||||||||
|
4.Shri Kmer Malngiang |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 10/4/2001 |
|||
|
Nongsteng |
|||||||||
|
5. Shri Ketlar Umdor |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 10/4/2001 |
|||
|
Nongsteng |
|||||||||
|
6. Shri Kiss Myrthong |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 28/4/2001 |
|||
|
Mawphu |
|||||||||
|
7. Shri Bna Rynjah |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 28/4/2001 |
|||
|
Mawphu |
|||||||||
|
8. Shri Iarap Kharbuli |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 29/6/2001 |
|||
|
Sohsarat |
|||||||||
|
9. Shri Tlen Chyne |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 28/6/2001 |
|||
|
Mawlong |
|||||||||
|
10.Shri Moha Ksan- |
do |
Rs. 20,000/- |
do |
Rs.10,000/- |
Rs.10,000/- |
Completed on 10/4/2001 |
|||
|
lah Jasier Shella |
|||||||||
|
4 |
East Khasi Hills |
Construction of foot- |
1. Ksar to Sohdoit |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs.25,000/- |
Completed on 10/4/2001 |
|
path from :- |
Nongsteng |
||||||||
|
2. Mawsahew to |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs.25,000/- |
Completed on 6/6/2001 |
|||
|
Umtlang |
|||||||||
|
3. Nongriat to Nong- |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs.25,000/- |
Completed on 2/6/2001 |
|||
|
thymmai Tyrna |
|||||||||
|
5 |
East Khasi Hills |
Construction of foot- |
1. Umlit River |
do |
Rs.1,50,000/- |
do |
Rs,75,000/- |
Rs.75,000/- |
Completed on 27/9/2001 |
|
bridge at :- |
Mawphu |
||||||||
|
6 |
East Khasi Hills |
Construction of fishery |
1. Shri Laitbor Warjri |
do |
Rs.46,400/- |
do |
Rs.23,200/- |
Rs.23,200/- |
completed on 16/5/2001 |
|
pond of :- |
Thangkharang |
||||||||
|
2. Shri Jiedman Pde |
do |
Rs.26,400/- |
do |
Rs.13,200/- |
Rs.13,200/- |
Completed on 25/4/2001 |
|||
|
Umsohphie Tyrna |
|
|
|||||||
|
3. Shri Batlin Chyne |
do |
Rs.46,400/- |
do |
Rs.23,000/- |
Rs.23,400/- |
Completed on 2/2/2001 |
|||
|
Kurikhar |
|||||||||
|
4. Shri Comfort Mawa |
do |
Rs.46,400/- |
do |
Rs.23,000/- |
Rs.23,400/- |
completed on 2/2/2001 |
|||
|
Ichamati |
|||||||||
|
5. Smti Ion Warbirom |
do |
Rs.46,400/- |
do |
Rs.23,000/- |
Rs.23,400/- |
Completed on 18/5/2001 |
|||
|
Majai |
|||||||||
|
VARIOUS BORDER AREAS DEVELOPMENT SCHEMES UNDER SPECIAL CENTRAL ASSISTANCE FOR 2000-2001. |
|||||||||
|
SL.NO |
DISTRICT |
NAME OF PROJECT |
BENEFICIARIES |
B.A.D.O |
AMOUNT SANCTIONED |
Date of Release |
Release of 1st |
Release of 2nd |
Status |
|
|
of fund to D.C |
Installment |
Installment |
Date of completion or O/O |
|||||
|
of work completed |
|||||||||
|
1 |
East Khasi Hills |
Construction of Fishery |
1. Kyrshan Kharsyntiew |
Sohra |
Rs. 34,800/- |
8.12.2000 |
Rs. 17,400/- |
Rs. 17,400/- |
Completed 0n 12/9/2001 |
|
pond of :- |
Laitduh |
||||||||
|
2. Iur Lyngdoh |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 19/9/2001 |
|||
|
|
|
Shnongkawar |
|
|
|
|
|
||
|
3. Redar Khyllep |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 30/8/2001 |
|||
|
Ichamati |
|
|
|
|
|
|
|||
|
4.Osmel Mawa Khah- |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 12/9/2001 |
|||
|
malai Mawlong. |
|
|
|
|
|
|
|||
|
5. Tlanphir Kharsyntiew |
do |
Rs. 34,600/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 12/9/2001 |
|||
|
Dhorom |
|
|
|
|
|||||
|
6. Dlansing Khyllep |
do |
Rs. 34,600/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 28/8/2001 |
|||
|
|
|
|
Ichamati |
|
|
|
|
|
|
|
|
7.Clara Shullai |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 28/8/2001 |
||
|
Ichamati Mawlong |
|
|
|
|
|
|
|||
|
8. Siter Mairom Shella |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 29/8/2001 |
|||
|
|
|
|
9. Donbokmon Dkhar |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 10/12/2001 |
|
|
Umsawmaskon Majai |
|
|
|
|
||||
|
10.Kphum Skhembill |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 30/6/2001 |
|||
|
|
Laitduh |
|
|
|
|
|
|
||
|
11.Phibadondor Syiem- |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 12/9/2001 |
|||
|
lieh Laitduh |
|
|
|
|
|
|
|||
|
12.Hanaviolin Kharsyn- |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 10/9/2001 |
|||
|
tiew Mawphu |
|
|
|
|
|
|
|||
|
13.Surontina Swer |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 29/8/2001 |
|||
|
Dongdurah Mawlong |
|
|
|
|
|
|
|||
|
14.Lumkurlang Kharsyn |
do |
Rs. 34,800/- |
do |
Rs. 17,400/- |
Rs. 17,400/- |
Completed on 12/9/2001 |
|||
|
tiew Mawphu |
|
|
|
|
|
|
|||
|
15.Kbiar Lyngdoh |
do |
Rs. 23,200/- |
do |
Rs. 11,600/- |
Rs. 11,600/- |
Completed on 28/6/2001 |
|||
|
Wahkaliar |
|
|
|
|
|
|
|||
|
2 |
East Khasi Hills |
Construction of foot- |
|
|
|||||
|
bridge/Suspension |
1. Over Wahmawsaw to |
do |
Rs.2,00,000/- |
do |
Rs.1,00,000/- |
Rs.1,00,000/- |
Completed on 5/9/2001 |
||
|
bridge. |
connected Nongriat with |
||||||||
|
Sohra Bazar. |
|
|
|
|
|
|
|||
|
2. Over river Pungdan to |
Rs.3,00,000/- |
do |
Rs.1,50,000/- |
Rs.1,50,000/- |
Completed on 10/5/2001 |
||||
|
connected Suktia via |
|
|
|
|
|
|
|||
|
Sohkhmie to Sohra |
|||||||||
|
|
|
|
Bazar. |
|
|
|
|
|
|
|
3 |
East Khasi Hills |
Construction of foot- |
|
||||||
|
bridge |
1. To connected Wah- |
do |
Rs. 50,000/- |
do |
Rs.25,000/- |
Rs. 25,000/- |
Completed on 6/9/2001 |
||
|
long Neng with Byrong. |
|||||||||
|
4 |
East Khasi Hills |
Construction of footpath |
|
|
|
|
|
|
|
|
and bridge. |
1. Over Wahlakhar from |
Rs.65,000/- |
do |
Rs, 32,000/- |
Rs. 33,000/- |
Completed on 28/8/2001 |
|||
|
|
|
|
Tyrngei to Mawkliaw |
|
|
|
|
|
|
|
|
village. |
||||||||
|
5 |
East Khasi Hills |
Constuction of C.C |
|
|
|
|
|
|
|
|
footpath at : |
1. Lynti Iew Mawphu 6 |
do |
Rs. 75,000/- |
do |
Rs. 37,500/- |
Rs. 37,500/- |
Completed on 30/8/2001 |
||
|
kms improvement |
|
|
|
|
|
|
|||
|
|
|
|
|||||||
|
2. Lynti Iew Nongsteng |
do |
Rs. 75,000/- |
do |
Rs. 37,500/- |
Rs. 37,500/- |
Completed on 26/5/2001 |
|||
|
5 kms Improvement |
|||||||||
|
|
|
|
|
|
|
|
|||
|
3. Lynti Iew Rumnong to |
do |
Rs. 75,000/- |
do |
Rs. 37,500/- |
Rs. 37,500/- |
Completed on 26/9/2001 |
|||
|
Shella 7kms. |
|
|
|
|
|
|
|||
|
|
|||||||||
|
4. Lynti Iew Umblai 1 km |
do |
Rs. 25,000/- |
do |
Rs. 12,500/- |
Rs. 12,500/- |
Completed on 6/6/2001 |
|||
|
Improvement |
|||||||||
|
|
|||||||||
|
5. Byrong village 1 km |
do |
Rs. 25,000/- |
do |
Rs. 12,500/- |
Rs. 12,500/- |
Completed on 20/9/2001 |
|||
|
Improvement |
|||||||||
|
6 |
East Khasi Hills |
Construction of footpath |
|||||||
|
at :- |
1. Within Mawsiangei |
do |
Rs. 50,000/- |
do |
Rs. 25,000/- |
Rs. 25,000/- |
Completed on 1/11/2001 |
||
|
village 4 kms improve- |
|||||||||
|
ment. |
|||||||||
|
2. From Umtlang to |
do |
Rs. 50,000/- |
do |
Rs. 25,000/- |
Rs. 25,000/- |
Completed on 23/9/2001 |
|||
|
Bngak Ryngkhaid and |
|||||||||
|
to Mawsynram bazar |
|||||||||
|
3 kms. |
|||||||||
|
3. From Mawlatang to |
do |
Rs.1,50,000/- |
do |
Rs. 75,000/- |
Rs. 75,000/- |
Completed on 30/5/2001 |
|||
|
Mawkliaw 3 kms |
|||||||||
|
approximately |
|||||||||
|
VARIOUS BORDER AREAS DEVELOPMENT SCHEMES UNDER SPECIAL CENTRAL ASSISTANCE FOR 2001-2002 |
||||||||||
|
SL.NO |
DISTRICT |
NAME OF PROJECT |
BENEFICIARIES |
BENEFICIARIES |
B.A.D.O |
AMOUNT |
DATE OF RELEASE OF FUND TO D.C. |
RELEASE OF 1ST |
RELEASE OF 2ND |
STATUS |
|
SANCTIONED |
OF FUND TO D.C |
INSTALLMENT |
INSTALLMENT |
DATE OF COMPLETION OR O/O OF WORK COMPLETED |
||||||
|
I |
||||||||||
|
1 |
EAST KHASI HILLS |
Construction of Fishery |
1.Shri. Bless Youthborn |
1.Shri. Bless Youthborn |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Work in Progress 50% completed |
|
Pond of :- |
Mawryngkhong |
Mawryngkhong |
||||||||
|
2.Shella Village |
2.Shella Village |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Yet to start |
|||
|
Durbar Iap-O-Ion |
Durbar Iap-O-Ion |
|||||||||
|
3.Shri.Mayon Japang |
3.Shri.Mayon Japang |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Yet to start |
|||
|
Sohbar |
Sohbar |
|||||||||
|
4.Shri.Bimol Dkhar |
4.Shri.Bimol Dkhar |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Digging initiated about 30% complete. |
|||
|
Laittyra |
Laittyra |
|||||||||
|
5.Arming Laloo |
5.Arming Laloo |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
Rs.25,000/- |
Completed on 3/5/2002 |
|||
|
Mawlong |
Mawlong |
|||||||||
|
6.Smti. Semina Chyne |
6.Smti. Semina Chyne |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
Rs.25,000/- |
Completed on 1/5/2002 |
|||
|
Mawlong |
Mawlong |
|||||||||
|
7.Smti. Phortimai Mawa |
7.Smti. Phortimai Mawa |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
Rs.25,000/- |
Completed on 1/5/2002 |
|||
|
Mawlong |
Mawlong |
|||||||||
|
8.Shri. Wellinson Tham |
8.Shri. Wellinson Tham |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Work statrted 20% complete |
|||
|
Sohkhmie |
Sohkhmie |
|||||||||
|
2 |
EAST KHASI HILLS |
Construction of Bettle |
1.Shri.Hitlar Dkhar |
1.Shri.Hitlar Dkhar |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
Rs.25,000/- |
Completed on 2/5/2002 |
|
Nut Soaking Pond of :- |
Umwai |
Umwai |
||||||||
|
2.Shri.Edren Dkhar |
2.Shri.Edren Dkhar |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Yet to start |
|||
|
Nongwar |
Nongwar |
|||||||||
|
3.Smti. Phrian Lynser |
3.Smti. Phrian Lynser |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
Rs.25,000/- |
Completed on 19/8/2002 |
|||
|
Wahkaliar |
Wahkaliar |
|||||||||
|
4.Smti.Jhen Laitthma |
4.Smti.Jhen Laitthma |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Material procured work yet to start |
|||
|
Nongsteng |
Nongsteng |
|||||||||
|
5.Smti. Robel Wanroi |
5.Smti. Robel Wanroi |
Sohra |
Rs.30,000/- |
18.1.2002 |
Rs.15,000/- |
- |
Yet to start |
|||
|
Rumnong |
Rumnong |
|||||||||
|
6.Shri.Dak Tangsong |
6.Shri.Dak Tangsong |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Yet to be inspected |
|||
|
Mawsiangei |
Mawsiangei |
|||||||||
|
7.Shri.Swit Umdor |
7.Shri.Swit Umdor |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Yet to be inspected |
|||
|
Suktia |
Suktia |
|||||||||
|
3 |
EAST KHASI HILLS |
Construction of |
1.Jamew village |
1.Jamew village |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Yet to be inspected |
|
Footpath at :- |
2.From Thangkharang |
2.From Thangkharang |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
Rs.25,000/- |
Completed on 2/5/2002 |
||
|
to Wahlong |
to Wahlong |
|||||||||
|
3.To Sohbar Football |
3.To Sohbar Football |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Work in full progress 90% completed |
|||
|
Ground |
Ground |
|||||||||
|
4.At Tyrna Village |
4.At Tyrna Village |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Yet to start |
|||
|
5.At Mawsahew |
5.At Mawsahew |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Work in progress materials procured in full 40% complete |
|||
|
Village |
Village |
|||||||||
|
6.Cement Foothpath |
6.Cement Foothpath |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Work yet to start |
|||
|
at Sohkynduh |
at Sohkynduh |
|||||||||
|
4 |
EAST KHASI HILLS |
Construction of Village |
1.Mawsiangei village |
1.Mawsiangei village |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Yet to be inspected |
|
Playground at :- |
2.L.P.School Tyrngei |
2.L.P.School Tyrngei |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Filling Walling in progress 70% completed |
||
|
5 |
EAST KHASI HILLS |
Construction of Public |
1.Jatap Village |
1.Jatap Village |
Sohra |
Rs.25,000/- |
18.1.2002 |
- |
- |
Yet to start |
|
Bus Waiting Shed at:- |
2.Lad-Byrwa Sohlap |
2.Lad-Byrwa Sohlap |
Sohra |
Rs.25,000/- |
18.1.2002 |
Rs.12,500/- |
- |
Yet to start |
||
|
3.Ichamati Road junction |
3.Ichamati Road junction |
Sohra |
Rs.25,000/- |
18.1.2002 |
Rs.12,500/- |
- |
Almost complete 90% done |
|||
|
to Ichamati P.H.C. |
to Ichamati P.H.C. |
|||||||||
|
4.Mustoh PWD Station |
4.Mustoh PWD Station |
Sohra |
Rs.25,000/- |
18.1.2002 |
Rs.12,500/- |
- |
Yet to start |
|||
|
6 |
EAST KHASI HILLS |
Construction of School |
1.Mawlong Umwai |
1.Mawlong Umwai |
||||||
|
Building at :- |
M.E.School Mawlong |
M.E.School Mawlong |
Sohra |
Rs.2,00,000/- |
18.1.2002 |
Rs.1,00,000/- |
- |
Yet to start |
||
|
2.Naya Basti Junior |
2.Naya Basti Junior |
|||||||||
|
Basic School |
Basic School |
Sohra |
Rs.1,00,000/- |
18.1.2002 |
Rs.50,000/- |
- |
Work in full progress 80% completed |
|||
|
3.Press L.P. School |
3.Press L.P. School |
|||||||||
|
Nongla |
Nongla |
Sohra |
Rs.1,00,000.- |
18.1.2002 |
Rs.50,000/- |
- |
60% complete |
|||
|
4.sohkhmie L.P.School |
4.sohkhmie L.P.School |
|||||||||
|
Sohkhmie |
Sohkhmie |
Sohra |
Rs.1,00,000/- |
18.1.2002 |
Rs.50,000/- |
- |
70% completed |
|||
|
7 |
EAST KHASI HILLS |
Purchase of Bee-Hives |
||||||||
|
of :- |
1.Shri.Sonwell |
1.Shri.Sonwell |
||||||||
|
Wanchang, Nongwar |
Wanchang, Nongwar |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Materials procurred 50% complete |
|||
|
2.Shri.Home Lyngdoh |
2.Shri.Home Lyngdoh |
|||||||||
|
Laitduh |
Laitduh |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Construction in progress 70% of work complete |
|||
|
3.Shri. Phek Umdor |
3.Shri. Phek Umdor |
|||||||||
|
Nongsteng |
Nongsteng |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Yet to start |
|||
|
4.Shri.Rotno Diengdoh |
4.Shri.Rotno Diengdoh |
|||||||||
|
Shella |
Shella |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
Yet to start |
||||
|
5.Smti.Pletina Syiemlieh |
5.Smti.Pletina Syiemlieh |
|||||||||
|
Mawphu |
Mawphu |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Material procured in full work yet to start |
|||
|
6.Smti.A.Riahtam |
6.Smti.A.Riahtam |
|||||||||
|
Sohkhmie |
Sohkhmie |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Work in progress 60% complete |
|||
|
7.Shri.Khorin Kon |
7.Shri.Khorin Kon |
|||||||||
|
Laitiam |
Laitiam |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Work in progress 50% complete |
|||
|
8.Shri.Bloster Wahlang |
8.Shri.Bloster Wahlang |
|||||||||
|
Laitiam |
Laitiam |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Work in progress 50% completed |
|||
|
9.Shri.Sbait Dkhar |
9.Shri.Sbait Dkhar |
|||||||||
|
Warbah |
Warbah |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Yet to start |
|||
|
10.Shri.Dek Mawpat |
10.Shri.Dek Mawpat |
|||||||||
|
Sohkynduh |
Sohkynduh |
Sohra |
Rs.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Work started 30% |
|||
|
11.Shri.Jan Khongshah |
11.Shri.Jan Khongshah |
|||||||||
|
Warbah |
Warbah |
Sohra |
RS.20,000/- |
18.1.2002 |
Rs.10,000/- |
- |
Yet to start |
|||
|
8 |
EAST KHASI HILLS |
Construction of |
||||||||
|
Bakery Unit of :- |
1.Shri.Oster Nongkynrih |
1.Shri.Oster Nongkynrih |
||||||||
|
Ichamati |
Ichamati |
Sohra |
Rs.1,00,000/- |
18.1.2002 |
Rs.50,000/- |
Rs.50,000/- |
Completed on 14/5/2002 |
|||
|
9 |
EAST KHASI HILLS |
Construction of Cement |
||||||||
|
Solid Block Unit at :- |
1.Shella by the Riwar |
1.Shella by the Riwar |
||||||||
|
Shella Welfare |
Shella Welfare |
|||||||||
|
Organisation. |
Organisation. |
Sohra |
Rs.1,50,000/- |
18.1.2002 |
Rs.75,000/- |
- |
Yet to start |
|||
|
10 |
EAST KHASI HILLS |
Setting up of Iron & |
||||||||
|
Steel Febrication by:- |
1.Shri.Harprit Phawa |
1.Shri.Harprit Phawa |
||||||||
|
Sohbar |
Sohbar |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
Rs.25,000/- |
Completed on 6/5/2002 |
|||
|
11 |
EAST KHASI HILLS |
Construction of Basket |
||||||||
|
Ball Court at :- |
1.St.Ursala School |
1.St.Ursala School |
||||||||
|
Mawlong |
Mawlong |
Sohra |
Rs.50,000/- |
18.1.2002 |
Rs.25,000/- |
- |
Yet to start |
|||